EskomSePush Logo - South Africa's Leading Loadshedding App

馃攲 Athlone Load Shedding Schedule

Load shedding schedule for Athlone, Cape Town on Monday, July 21, 2025:

Stage 1: 8 PM to 10:30 PM
Stage 2: 4 AM to 6:30 AM, 8 PM to 10:30 PM
Stage 3: 4 AM to 6:30 AM, 8 PM to 10:30 PM
Stage 4: 4 AM to 6:30 AM, 12 PM to 2:30 PM, 8 PM to 10:30 PM
Stage 5: 4 AM to 6:30 AM, 12 PM to 2:30 PM, 6 PM to 10:30 PM
Stage 6: 2 AM to 6:30 AM, 12 PM to 2:30 PM, 6 PM to 10:30 PM
Stage 7: 2 AM to 6:30 AM
Stage 8: 2 AM to 6:30 AM
Post attachment
鉁夛笍 15 Chats
馃憤 2
鉁–atch up
On July 21, 2025, the load shedding schedule for Athlone, Cape Town was shared. Stage 1 is scheduled from 8 PM to 10:30 PM. Stages 2-4 are scheduled from 4 AM to 6:30 AM and 8 PM to 10:30 PM. Stage 4 also has load shedding from 12 PM to 2:30 PM. Stages 5 and 6 are scheduled from 4 AM to 6:30 AM, 12 PM to 2:30 PM, and 6 PM to 10:30 PM. Stages 7 and 8 are scheduled from 2 AM to 6:30 AM. A resident reported a stolen bin on Peter Street.
Download the ESP App to open this chat
Download on App StoreGet it on Google Play